Why PASS was created
PASS (Proven Auditable Safe Supported) was created to increase transparency, build confidence and provide objective evidence behind every important aspect of a pilot ladder.
The idea originated during discussions with our Australian partner, Bay Providors. They explained that introducing a new manufacturer to the market would naturally generate questions from ship chandlers, ship owners, inspectors and other stakeholders who may not yet know Drewil Entership or our products.
The question was simple:
“How can we prove that Drewil delivers exactly what it claims?”
Our answer was PASS.
PASS is an evidence platform designed to demonstrate, rather than simply declare, how our products are designed, manufactured, tested, inspected and continuously improved.
Instead of asking customers to trust our words, we invite them to review the evidence.
Our philosophy
We believe that trust should be built on facts.
Every PASS module explains one important aspect of safety, quality or compliance and, whenever possible, is supported by objective evidence.
Depending on the type of information, evidence is made available through different access levels, ranging from publicly available information to controlled documentation shared only with verified partners or certification bodies.
Our objective is simple:
Not because we say it. Because we can prove it.
Looking beyond Drewil Entership
PASS is not intended to be only a company presentation.
It is a long-term initiative aimed at improving transparency within the pilot ladder industry.
After many years of cooperation with customers, pilots, notified bodies, classification societies and industry experts, we have observed that regulations are sometimes interpreted differently, documentation varies significantly between manufacturers and many important aspects remain difficult to verify.
We believe that greater transparency benefits everyone.
It improves confidence, simplifies verification and ultimately contributes to safer pilot transfers.
For this reason PASS is continuously evolving.
Our long-term ambition is to develop PASS into a recognised industry good practice and, where appropriate, inspire future industry standards.
If better evidence can help make pilot transfers safer, we believe it should become available to everyone.
HOW PASS WORKS
What you see at each level
PASS opens in steps, and each level is named after what you have signed. What changes is not only how much you see — it is the kind of evidence: photographs, then footage, then documents, then the full dossier.
Open
Rope · 4 photographs
Manila and synthetic rope arrives in bales marked with diameter and length. We cut it, splice it and seize it by hand — the same way, by the same team, year after year.
Wood · 5 photographs
Hardwood arrives sawn. Steps are cut to length, drilled, grooved for grip and treated here — which is why we can name the species, the grade and the moisture content.
Aluminium · 2 photographs
Profile and sheet come in against a mill certificate that names the heat they were rolled from. Spreaders and fittings are cut and formed here, to our own drawings.
Chocks · 4 photographs
The spreader chocks are not bought as parts. HDPE granulate arrives against an inspection certificate and the chocks are moulded on site — in our colours, to our dimensions.
All in-house · 1 photograph
Every operation between raw material and finished ladder happens in one workshop in Pomieczyno. No second site, no subcontracted assembly, no white label behind us.
Own energy · 1 photograph
Two photovoltaic installations beside the workshop power the site. The figures further down this page are read live from the inverters, not typed in.
Available now
Anyone can open these today.
Live, not typed in
Read from our own systems.
Not shown here
Held back until there is a reason to share it.
Suppliers · quantities · prices · any document scanRegistered
Factory walkthrough — Pomieczyno
The full production route on camera, end to end, in one take.
Certificates
Product certificates and type approvals, viewable in the browser — not downloadable.
Available now
Released the moment your account is approved.
Why register
The photography pack is a professional session — yours to use in catalogues, leaflets and on your own site.
Still not shown
Nothing commercial or supplier-related opens here.
Suppliers · quantities · prices · test dossiersNDA
Material evidence register
Every quality document we hold, by type, year and whether it identifies a batch — without supplier names, quantities or prices.
Redacted document on request
Name any item on the register and we prepare it as a flattened image with commercial fields masked. The original never leaves our system.
Available now
Released once the NDA is countersigned.
In preparation
Being assembled as the record grows.
Still not shown
Commercial terms stay closed until there is an agreement.
Supplier names · quantities · prices · invoice numbersPartner & Hub
Technical drawings
Dimensioned drawings for every ladder type we build.
Manuals & standards
User manual, maintenance and inspection instruction, current ISO and IMO texts.
Stock & commercial
Consignment stock position, price matrices and marketing material.
Available now
Live in the partner library.
What we ask in return
A partnership reports both ways.
Support included
Manufacturer-level answers, including outside working hours.
Notified Body
Available now
Held in the notified-body branch.
In preparation
Being compiled for the next audit cycle.
Not shown here
Commercial material is out of scope for a regulator.
Prices · partner terms · comparison materialThe last link: which batch this ladder was made from
Knowing our materials is one thing. Naming the exact batch that went into one numbered ladder is another — and it is the link we are closing now. From 12 August 2026 every delivery is given an internal batch number on arrival, and every work order records the batches it used.
Serial number → product certificate
Held in our system since the ladder was made.
Serial number → work order
Assembly date and the team that built it.
Work order → material batch
Recorded on the assembly card. An order cannot be closed with the field empty.
Batch → supplier certificate
No quality document, no release to production.
Go as deep as you need
Most visitors never leave Level 01, and that is fine — it is built to answer the first question on its own. When you need more, the next level is one signature away.
Request access →CASE STUDIES — PASS 17
ASK US YOUR HARDEST QUESTION
Access for registered partners (QUALIFIED / VERIFIED levels). Login credentials are provided by Drewil Entership.